The Secretary-General of the Imam Hussein holy shrine Sheikh Abdul Mehdi El-Kerbala'i, inaugurated the Heremain first electricity transmission station at the area which is between the two holy shrines. El-Kerbala'i, stated that the station was 63 Megawatt and it would transmit and increase electricity which is supplied to the Imam Hussein and El-Abbas holy shrines. Engineer Kerrar Ali Sa'ad, the head of the Electricity Division of the Imam Hussein holy shrine mentioned that the project had been started being carried out since 2009 in accordance to the increase of power consumption. Translated by: Mohammed Jasim
اترك تعليق